Pipes in polyurethane foam insulation: types, application, choice from A to Z

  • What is a “pipe in polyurethane foam”?
  • Types of pipe insulation
  • Comparison table for types of insulation for external installation
  • Types of pipes in polyurethane foam
  • How to choose polyurethane foam pipes
  • How to determine the quality of a pipe in polyurethane foam
  • Acceptance of pipes based on thermal insulation quality
  • Why may the delivery length of pipes be slightly shorter than ordered?
  • Can I use used pipes?
  • How to lay PPU pipes
  • Methods for laying pipes in polyurethane foam
  • Who produces polyurethane foam pipes
  • Condition of heating networks in St. Petersburg

What is a “pipe in polyurethane foam”?

Pipes in polyurethane foam are all pipes for hot water or heating.
They are also called “pre-insulated pipes”, “pipes in polyurethane foam insulation”, “pipes for heating networks”. These are ordinary steel pipes, which are additionally covered with a layer of insulation to reduce heat loss. PPU is an abbreviation that stands for “polyurethane foam”. Pipes without insulation are used only in water supply, gas pipelines or sewerage. The outside of the pipes in polyurethane foam is covered with a black (polyethylene) or gray (galvanized) sheath. And the insulation itself is yellow, with a thickness from 26mm to 90mm depending on the diameter of the steel pipe. Polyurethane foam – yellow. It is very similar to Macroflex foam, but this is not visible in the photographs, because black rubber-bitumen mastic is applied to the end of the insulation so that the foam does not get wet. The ends of the steel pipe stick out from under the insulation to prevent the foam from burning during welding, and they are painted with a primer to protect against corrosion.


At the factory


In the trench


In the context

Types of pipe insulation

Main types of insulation for external installation:

  • Pipes in polyurethane foam – in polyurethane foam insulation. Used for heating networks.
  • Pipes in VUS insulation. VUS stands for “very enhanced.” Why "very"? Because those who invented this term have little imagination, and also because according to GOST there is a pipe with reinforced insulation (up to 2.5 mm insulation), and there is one with even more reinforced insulation (up to 3.5 mm). Used for water pipes, gas pipelines, and cases. VUS cases are used to protect underground communications. And even heating network pipes in polyurethane foam are sometimes laid under roads inside steel pipes in VUS insulation. VUS insulation – protects the steel pipe from corrosion and mechanical stress. Some network operating organizations allow the use of used pipes in VUS insulation for cases.
  • Pipes in PPM insulation – polymer-mineral foam insulation. A relatively new development, very similar to polyurethane foam, but without a shell. Instead of a shell, it has a hard, thin outer layer of polyurethane foam mixed with sand, and is laid directly into the ground without additional protection. A small range of shaped parts due to the complexity of manufacturing (all products are filled with foam in specially made molds) creates limitations for the designer’s imagination and increases labor costs on site. What can be made in polyurethane foam, at the factory has to be done manually on site.

Price

40*3,0/110699,78
57*3,5/125715,83
57/140796,08
76/140849,58
76/160979,05
89/160995,10
89/1801 065,72
108/1801 233,71
108/2001 333,22
133/2251 612,49
133/2501 842,54
159/2501 884,27
159/2802 191,36
219/3153 232,47
219/3553 693,64
273/4404 996,90
273/4505 621,78
325/4505 928,87
325/5006 612,60
426/5608 103,11
426/6309 529,42
530/71012333,89
630/800Agreement.
720/900Agreement.
820/1000Agreement.
920/1100Agreement.
1020/1200Agreement.

Comparison table for types of insulation for external installation

PPU typePU INSULATIONVUS ISOLATIONPPM INSULATIONMINVATA
Max. pipeline temperature140 degrees60 degrees150 degreesmore than 300 degrees
Waterproofing from the environmentYesYesYesNo
Reducing heat lossYesNoYesYes
MinusesThe maximum pipe temperature is not suitable for steam pipeDoes not reduce heat loss, not suitable for hot waterSmall range of shaped products due to the peculiarities of the production processImpossibility to manufacture pipes and elements in a factory; installation is possible only on site
prosManufacturing features allow us to minimize labor costs during installation, a “turnkey heating main” and a wetting control system are delivered to the siteLow cost of insulationAbsent, compared to polyurethane foamSuitable for high temperature pipelines, steam pipelines
PU INSULATION
Max. pipeline temperature140 degrees
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
PU INSULATION
Max. pipeline temperature140 degrees
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
PU INSULATION
Max. pipeline temperature140 degrees
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
PU INSULATION
Max. pipeline temperature140 degrees
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes
Waterproofing from the environmentYes

Types of pipes in polyurethane foam

In a PPU pipe, the metal pipe itself and the polyurethane foam remain unchanged. The wall thickness of steel pipes in heating networks can be from 3mm to 12mm. Foam thickness from 26 mm to 90 mm. The thickness of the polyethylene shell (black) is from 3 mm to 40 mm, galvanized (gray) from 0.55 mm to 1 mm. It all depends on the diameter of the main steel pipe. PPU pipes differ in the type of protective coating. In addition, there is a separate version with a heating cable, which makes it possible to transport liquid in sub-zero ambient temperatures. Pipes in polyurethane foam have special markings, depending on the features:

  • PE - polyethylene casing;
  • OTs - casing made of galvanized steel;
  • PE-U (or PE-B) - the polyethylene shell is reinforced with overhead bandage rings.
  • SODC - (operational remote control system) is added after the designation of the casing, which means that two copper wires pass through the insulation (foam), which allow you to connect special devices (megaohmmeter and reflectometer) to the heating main, and find out whether there is water in the insulation and in which one the place got wet, so as not to dig up or open the entire heating main, but to fix the problem locally.


Types of pipes in polyurethane foam

Where are polyurethane foam pipes used?

They are widely used for the arrangement of heating systems for centralized and local heat supply, as well as cold and hot water supply systems. The demand is due to improved performance characteristics. Compared to other similar products, they have the following advantages:

  • High thermal insulation properties. The thermal conductivity of polyurethane foam used as insulation does not exceed 0.030 W/m*K. This is the lowest figure among all materials that can be used for pipeline insulation. Therefore, heat loss is reduced to 1-2%. For comparison, in old pipelines heat loss reaches 25-30%.

NB: In old heating networks, reinforced foam concrete was used as insulation, and roofing felt was used as a gyroprotective coating. A metal mesh was laid on top and plastered.

  • Durability. The insulation layer and outer casing eliminate the impact of environmental factors on the metal. That is, they provide anti-corrosion protection and protection against mechanical damage, due to which the service life of the products reaches 30 years or more;

NB: The shell of the pipe in polyurethane foam, when laid externally (on the ground), protects the foam from rain, snow, hail, and when laid underground, from groundwater and stray currents, which, if they reach the body of the steel pipe, will cause electrocorrosion. The thickness of the polyethylene shell is many times thicker than galvanized shell, because it also takes on the pressure of the soil. In addition to all the listed misfortunes, the pipe in the ground does not lie motionless, but constantly moves due to the linear thermal expansion of the metal, and over time it wriggles like a snake. The polyethylene shell protects the thermal insulation layer from all of the above.

  • Remote diagnostics. The presence of a UEC system makes it possible to detect defects in a timely manner and, thereby, prevent the occurrence of serious emergency situations;

NB: SODK is a system for operational remote control. It consists of two copper wires that are located in the middle of the heat-insulating layer of the pipe in the polyurethane foam. If water gets into the insulation, the contact between the wire and the body of the steel pipe closes. When you connect a megohmmeter, the device will show a short circuit and it will become clear that there is water insulation in this section of the pipeline. In order to more accurately determine the location of wetting, a pulse reflectometer is used. This device measures the wave resistance of polyurethane foam. Using it, you can create a reflectogram of a heating network with a length of more than a thousand meters and determine the location of the defect with an accuracy of less than one meter.

The future of heating networks is as follows: a stationary reflectometer is connected to each heating network, which, using a GPS modem, transmits a signal online to the operator’s console. As soon as the insulation gets wet in any area, the operator’s control light comes on, and he immediately sends the repair team to the track, telling them the specific area of ​​the wetness.

In Russia, in 2022, such systems have already begun to be tested and gradually implemented.

  • Quick installation. Channelless installation allows you to reduce the volume of excavation work and do without installing drainage networks. These factors not only reduce installation time, but also reduce the cost of laying the pipeline.

Processes during foaming and mixing PU foam components

When mixing the polyisocyanate and polyol components in the mixing compartment of the casting machine, a fine emulsion is formed. The increase in temperature and increase in viscosity of the mixture is explained by the exothermic reaction occurring in it. When the temperature reaches values ​​greater than 25-28 degrees, intensive foaming of the composition and gas formation begins, which is recorded as the start time when insulating pipes.

Shells for pipes are made by extrusion, but their walls are much thinner than those of conventional pipes, so when pouring foam you must strictly follow the technology

READ ALSO: How and with what to connect watering hoses, Do-it-yourself repairs

The process of gas formation is stabilized by an increase in the viscosity of the polyurethane foam mixture and the presence of an organosilicon foam stabilizer in it. Additional growth of bubbles is also possible due to the reactions of the polyisocyanate and air moisture. Chemical processes lead to the emergence of a polymer structure (three-dimensional). The beginning of its formation is recorded as the gelation time.

Note! After this shaking, mechanical movements, and other influences on the assembly of the structure can cause the polyurethane foam layer of hardening foam to sharply lose quality.

For this purpose, the pipes are kept in thermal insulation on racks. At this time, there are many unreacted groups in the polymer matrix. Further polymerization is characterized by the time the surface of the polyurethane foam loses its stickiness and the time it takes to fill the space between the shell and the pipe. After a few hours, the chemical processes are completed, and after a few days, the mechanical relaxation processes are completed.

How to choose polyurethane foam pipes

The choice of one or another variety depends on the operating conditions. For example, products in a polyethylene sheath (PE) are intended for the installation of an underground pipeline. Where the pipeline runs under a railway, highway, foundation, or in places of increased soil mobility, it is necessary to use pipes with reinforced insulation (PE-U). Laying of above-ground pipelines is carried out using pipes with a galvanized steel casing (OC). Such a shell not only provides protection from climatic factors and mechanical stress, but also gives the main system additional rigidity.

Equally important is the choice of diameter. In main heating mains and water supply systems, pipes with a diameter of 525 to 1020 mm are used. For urban distribution networks, the diameter should not exceed 525 mm. When constructing an autonomous heating and water supply system in private households, a diameter of 50-100 mm is sufficient.

Note! PU foam pipes can be used in heating networks where the temperature of the working fluid will not be higher than 140 degrees and the pressure will not be 16 bar. A short-term temperature jump of 10 degrees is allowed. At the same time, contrary to common sense and the laws of physics, GOST 30732-2006 for pipes and shaped elements in polyurethane foam does not establish a relationship between diameter and pressure, therefore any pipes in polyurethane foam can be used in the specified pressure range.

Specifications

PE d, mmdy, mms, mmProtective shell pipeLI, mmEstimated mass 1 m.p. products, kg
Dp, mm (PE)Sp, mmSc, mmPE
32/1102531102,50,551504,1
38/1103231102,50,551504,1
45/1254031252,50,551505
57/1255031252,50,551505,8
57/1405031402,50,551505,8
76/14065314030,551507,4
76/16065316030,551507,4
89/16080416030,615010,8
89/18080418030,615010,8
108/180100418030,615013
108/200100420030,615013
133/22512542253,50,615017
133/25012542503,50,615017
159/2501504,52503,90,715022,2
159/2801504,52803,90,715022,2
219/31520063154,90,715039
219/35520063554,90,715039
273/44025064005,60,821058,2
273/45025064505,60,821058,2
325/45030064505,60,821069,6
325/50030065005,60,821069,6
426/560400756071,021094,1
426/630400763071,021094,1
530/71050077108,91,0210125,9
630/8006008800101,0210150,2
720/900700890011,21,0210193,3
820/10008009100012,41,0210243,3
920/110090010110013,81,0210278,1
1020/1200100011120014,91,0210338,6

How to determine the quality of a pipe in polyurethane foam

The quality of the pipe in polyurethane foam is determined according to several GOSTs, GOST 30732-2006 (for insulation) and GOST for the steel pipe itself.

First of all, it is necessary to determine the compliance of the steel pipe with the manufacturer’s certificate. Pipes above diameter 159 must be marked. In the case of pipes of diameter 159 and below, in the absence of markings, a “tag” from the pipe bundle, or “label,” must be attached to the set of documentation. Sample:


Tag sample

It is imperative to check the data from the “tag” and the quality certificate, and also make sure that the length of the pipe whip corresponds to the length stated in the quality certificate.

Since quality acceptance can occur when insulation has already been applied to the pipes in polyurethane foam and the marking can be hidden under it, it is necessary to carry out inspection before applying the insulation, come to inspect the steel pipe, and if this is not possible, for example, when supplied from another region , ask in advance to send a certificate, tag and photographs of the steel pipe with markings.

Also, steel pipes used in heating networks should not be older than a year from the date of manufacture. GOST 30732-2006 does not have this requirement, but this is an unspoken rule in heating networks, since metal warehouses store pipes in the open air, and they cannot lie like that for more than a year - they have time to rust badly.

Acceptance of pipes based on thermal insulation quality

GOST 30732-2006 contains a huge number of parameters that need to be controlled, including, the manufacturer of polyurethane foam is required to attach an acceptance test report for each batch of products supplied to them, but the main attention should be paid to the following:

Thermal insulation end: The foam must be dense. If you can stick a knife into it more than 40 - 50 mm without effort, you should think about more accurate methods of controlling this batch or demand to provide an acceptance test report.

At the end, where the thermal insulation adjoins the steel pipe and the shell, there should be no gaps or cracks, otherwise water will get there and the insulation will be damaged.

The end must be covered with waterproofing material, and the free end of the pipe must be painted with a primer. The free end of the steel pipe must have a chamfer at an angle of 30 degrees. The waterproof shell should not have deep scratches or cracks.

If, during a visual inspection, the pipe does not perfectly coincide circumferentially with the shell, it is necessary to check the deviation of the axial lines with a tape measure. Usually this problem is not immediately visible, but when cutting the pipe on site.

Any product in PPU must have a marking indicating:

  • product designation;
  • trademark or name of the manufacturer;
  • batch number;
  • date of manufacture.


Marking on products in polyurethane foam

If the pipe in polyurethane foam is made with SODK, it is necessary to check the conductors for breaks and short circuits using a megohmmeter. After checking, it is necessary to make an appropriate entry in the work log.

Not all aspects of pipe quality control in polyurethane foam are listed here, but only the main ones; you can fully accept polyurethane foam insulation only after fully familiarizing yourself with GOST 30732-2006.

Application

Let's look at polyurethane foam - what it is as a material for building and finishing a house. The main purpose of foam is insulation, sound insulation, sealing of local areas and installation gaps. Also, with the help of a liquid composition, various structural elements are secured: window sills, slopes, boxes and frames, drywall and panels.


Insulation of a window opening with polyurethane foam Source adgesia.ruhttps://m-strana.ru/articles/uteplenie-doma-iz-gazobetona/

Why may the delivery length of pipes be slightly shorter or longer than ordered?

When issuing an invoice, the theoretical length of the pipe is taken. At metal warehouses, pipes are stored in bundles, and it is not possible to keep track of which pipe is on top and which is on the bottom. After paying the invoice, at the time of loading the steel pipe at the metal depot, the customer is informed how many strands of pipe and what length were loaded for it and clarifies: should the footage be rounded down or up?

When ordering a seamless pipe, everything is even more complicated; according to GOST 8732-78 and GOST 8734-78 it is unmeasured, that is, each rod has an individual length. GOST allows a difference from 4m to 12m. In reality, the difference in a particular batch is smaller, for example, from 9m to 11m. In some cases, when ordering a standard size, the insulation plant may cut it to size and keep the rest of the pipe, but such cases are always agreed upon in advance (before paying the invoice).

Can I use used pipes?

In laying heating networks, used pipes are practically not used. Only as VUS cases, when new pipes in polyurethane foam are laid inside a used large-diameter pipe. In this case, the used pipe only performs the function of additional protection and the requirements for it are, accordingly, much lower.

The laying of heating networks is strictly regulated by state standards; it is almost impossible to use used pipes without damage. The pipe through which water flowed, even for a relatively short time, is no longer suitable for reuse due to corrosion. The pipes through which oil flowed become so saturated with it that, again, they become unsuitable for heating networks where water flows through the pipes. Only gas pipes after sandblasting look almost like new and are generally similar in their characteristics to new pipes that have been lying in the open air at a metal warehouse for a couple of years. But in any case, it is more profitable for pipe factories to take used pipes for scrap and cast new pipes than to try to sell used products.

The polyurethane foam shell after the cycle “production – delivery – laying – operation – digging – delivery back” becomes unusable. It would never occur to anyone to reuse such pipes in a real heating network, since the insignificant savings pale in comparison to the cost of operation that increases tenfold when the insulation begins to deteriorate and become wet.

Definition

To better understand what polyurethane foam is, we will give a brief definition of the material - it is a synthetic foam with a cellular structure. Refers to a section of plastic filled with a special inert gas, and is often used in construction and manufacturing.

Among the undoubted advantages:

  • • long-term use;
  • • ease of operation;
  • • minimal thermal conductivity;
  • • excellent adhesion.

This is one of the high-quality insulation materials that is often used to improve the structural features of a house. Some surfaces are covered with gas-filled polyurethane foam of complex shapes. It has a long lifespan and is easy to use on construction sites.

How to lay PPU pipes

Laying in a trench is carried out on a flat sand cushion with a thickness of at least 100 mm. Pipes and other pipeline elements are first checked for defects. To eliminate the risk of damage to the containment, the pipes must be lowered smoothly, without hitting the bottom and walls of the trench. At the next stage, the joints are welded and the cables of the UEC system are connected. After checking the quality of the weld with a flaw detector, the joints are sealed using heat-shrinkable sleeves.

Important information! Work on insulating joints should be carried out at an air temperature of at least -15 degrees.

In the case of laying a pipeline through a foundation or wall, seals and wall entry collars are used. The standard length of the oil seal is 450mm, but any length can be manufactured. After their installation, concreting is carried out.

When laying a channel, a drainage pipe must be laid next to the heating main, which drains water from the heating network, and collects it in a reinforced concrete well, and a flap valve according to the A-397-80 series is installed at the outlet of the drainage pipe.

If underground installation is not possible (for example, in a wetland), the above-ground method is used. It involves installing pipes on special supports. The technology for connecting joints remains the same.

Pipes are delivered by scow. A scow is a machine 12m or 13.6m long. The machine must be capable of top loading; the pipes are loaded with a crane.

Methods for laying pipes in polyurethane foam

Ductless pipe laying


Channel pipe laying

Initially, all heating networks were laid without ducts, but then wise people came up with the idea of ​​additionally insulating the pipe in polyurethane foam with reinforced concrete channels (trays). The channels perform the function of additional waterproofing, and also take on the load of the soil in places where heating networks pass under roads, where, in addition to the soil, passing traffic puts pressure on the pipe. For channelless installation in such places, VUS insulated cases are used.

The main problem lies in the method of compensating for the linear expansion of the steel pipe. As mentioned above, the pipe in the ground does not lie motionless, but is constantly moving and bending. When laying without channels, compensation for pipeline expansions is carried out naturally; the route is not laid in a straight line, but makes many turning angles, and it, like an “accordion,” compensates for itself. Soft mats are placed under the turning angles so that the bends have somewhere to “play”. In the case of channelless installation, pipes are laid almost in a straight line, which is definitely a plus, because it is not always possible to design many turns, for example, neighboring underground communications may interfere.

To compensate for linear temperature expansion during channel installation, SKU - bellows compensators are used

Inside the SKU in the PPU there is a KSO - an axial bellows compensator, which is an “accordion” made of stainless steel, which has the ability to compensate for compression and decompression. This device is placed between two fixed supports, and the pipes are mounted on sliding supports (they are called SPOk - Sliding Channel Supports), on concrete pads installed on the bottom of the channel. The bottom of the channel in the places where the pillows are installed is coated with technical petroleum jelly.


Bellows compensator

What do we end up with? Hot water is supplied to the heating main, the pipe expands, “rides” on lubricated cushions along the line of the route, the “accordion” contracts and compensates for the expansion, the pipe does not bend. As the temperature drops, the pipe contracts, the “accordion” expands, and the pipe on the cushions “rides” back along the axis of the route.

Condition of heating networks in St. Petersburg

The heating network system of St. Petersburg is one of the most extensive in Russia. The total length of the pipelines exceeds 4770 km, and the diameter of the pipes varies from 50 to 1400 mm. Heating mains are mostly laid underground. Unfortunately, a significant part of them are in emergency or pre-emergency condition, since these are still Soviet pipes 30 years old. Therefore, the installation of new energy-efficient heating networks is more important than ever for the city.

The information in the article is current as of 06/01/2021.

Comments

April 21, 2017
Askar

Hello, our groundwater lies from the ground - 0.5 m. + 0.5 m embankment, totaling 1.0 m to groundwater. The question is whether it is possible to lay a heating network without a duct version, the depth of the axes of the heating mains from the surface is 0.7 m.

0 0 Reply

April 21, 2017

Mikhail (o-trubah.ru) ➜Askar

At this level of groundwater, the channelless option is very risky. I would still consider the possibility of laying the heating main in trays.

0 0 Reply

Rating
( 1 rating, average 5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]